Process

 

In order to properly determine a High-Speed Rail alignment that would be of most benefit to the Southern California area, three alternatives were evaluated using typical industry standard practices. 

 

The team began by identifying the project location and affected areas.  After determining the location, the purpose and needs for the project were established, which lead to the identification of three design alternatives to be evaluated.  For each alternative, horizontal and vertical alignments were developed along with an InRoads and an InfraWorks 3D model. 

​

To begin the analysis, the specific project footprint of all three alternatives was identified.  Using this information, an environmental impact analysis was conducted.  A benefit/cost analysis of each alternative was also conducted and led to the development of a weighted decision matrix in order to evaluate the quality of each alternative in addition to the financial aspects of each alternative. ​​

​

​
Project Tasks
Project Deliverables

​​

  • Station Identification

    • Location Determination​

    • Impact Analysis

  • Alternative Scoping

  • ​Geometric Design

    • Horizontal Alignment Design​

    • Vertical Alignment Design

    • InRoads Model

    • ​Impact Analysis​

    • Travel-Time Analysis

​​​

​

​​

  • Environmental Analysis

    • Preliminary Environmental Impact Report​

  • Benefit/Cost Analysis​

  • Recommendation Analysis

  • Geometric Drawings

  • 3D Digital Model

  • Formal Presentation

  • Project Reports

​​​

​

 

The following deliverables are produced as part of this project:

  1. Preliminary Environmental Impact Report

  2. Project Reports 

​

Each deliverable is broken into tasks as shown below.

​

Deliverable 1: Preliminary Environmental Impact Report 

  1. Land Use Evaluation

  2. Growth Analysis

  3. Farmlands/Timberlands Identification

  4. Impacts Evaluation

  5. Visual/Aesthetic Analysis

  6. Cultural Resources

  7. Hydrology and Floodplain Analysis

  8. Water Quality and Storm Water Runoff Evaluation

  9. Geology, Soils, Seismicity, and Topography Analysis

  10. Paleontology Analysis

  11. Hazardous Waste/Materials Analysis

  12. Air Quality Analysis

  13. Noise and Vibration Analysis

  14. Energy and Climate Change Analysis

  15. Biological Environment Analysis

  16. Cumulative Impacts Evaluation

​

Deliverable 2: Project Report (PR)

  1. Evaluation of Existing Conditions

  2. Evaluation of Corridor and System Coordination

  3. Evaluation and Analysis of Alternatives

    • Geometric Layout

    • 3D Modeling

    • Benefit-Cost Analysis

    • Weighted Decision Matrix

  4. Alternative Recommendation

​